MOMBASA, LNG to POWER &
NG Transmission System Development
(Project with reference and registration code ES00101/AMACO/2024)
Mombasa, LNG to Power
powering the future
Project Details with registration code
(ES00101/AMACO/2024)
Operator: AMACO Ltd (Kenya)
Owner: SPV
Location: Kwale County, Mombasa Port
Capacity: 10.5 billion cubic meter per year / 6.2 mtpa
Status: permitting phase
Type: delivery point, storage, regas
Start Year: 2027
Note: mtpa = million tonnes per year.
Kenya, Mombasa Project
MOMBASA LNG TO POWER & NG Transmission System Development
Project with reference and registration code ES00101/AMACO/2024, with total estimated regasification capacity of 10.5 BCM of normal natural gas per year.
MOMBASA LNG TO POWER
Both operations a) LNG delivery and Regas, b) LNG to Power with electricity production
MOMBASA LNG TO POWER & NG
A diagram model of both designs and operations
MOMBASA CCGT POWER directly fueled from LNG with total net capacity of 1.500MW
MOMBASA NG Transmission System Development Connection with the power production, directly from the terminal to the plant (LNG to Power)
MOMBASA NG Transmission System Development
Connection with the national system
MOMBASA NG Transmission System Development
Connection with the national transmission system: Mombasa to Nairobi (capital city), almost 485.8km.