Mombasa, LNG to Power

Mombasa, Kenya
LNG to Power

AMACO S.A.

MOMBASA, LNG to POWER & NG Transmission System Development

(Project with reference and registration code ES00101/AMACO/2024)

Mombasa, LNG to Power

powering the future

Project Details with registration code

(ES00101/AMACO/2024)

  • Operator: AMACO Ltd (Kenya)
  • Owner: SPV
  • Location: Kwale County, Mombasa Port
  • Capacity: 10.5 billion cubic meter per year / 6.2 mtpa
  • Status: permitting phase
  • Type: delivery point, storage, regas
  • Start Year: 2027

Note: mtpa = million tonnes per year.

Kenya, Mombasa Project

MOMBASA LNG TO POWER & NG Transmission System Development

Project with reference and registration code ES00101/AMACO/2024, with total estimated regasification capacity of 10.5 BCM of normal natural gas per year.

MOMBASA LNG TO POWER

Both operations
a) LNG delivery and Regas,
b) LNG to Power with electricity production

MOMBASA LNG TO POWER & NG A diagram model of both designs and operations

MOMBASA CCGT POWER directly fueled from LNG with total net capacity of 1.500MW

MOMBASA NG Transmission System Development

Connection with the national system

MOMBASA NG Transmission System Development

Connection with the national transmission system: Mombasa to Nairobi (capital city), almost 485.8km.

Scroll to Top